Announcement from PrairieWinds press conference in South Dakota

Extra good news at yesterday’s press conference celebrating the start of construction at Basin Electric’s Crow Lake Wind Project in south-central South Dakota!

PrairieWinds SD 1

U.S. Representative Stephanie Herseth Sandlin announces grant. Also pictured: Ron Harper, Basin Electric CEO and general manager, and Jeff Nelson, East River Electric Power Cooperative general manager.

U.S. Rep. Stephanie Herseth Sandlin of South Dakota announced (see video below) a $1.167 million grant from the U.S. Economic Development Association to Mitchell Technical Institute for the purchase of a wind turbine in Basin Electric’s Crow Lake Wind Project.

The Crow Lake Wind Project will consist of 108 turbines located throughout Aurora, Brule and Jerauld Counties just east of Chamberlain in the south-central part of the state.

A subsidiary of Basin Electric, PrairieWinds SD 1 Inc., will own and operate 101 turbines; however, turbine “101” will be used by Mitchell Technical Institute.

The school, located in Mitchell, SD, will use the turbine to train students in their wind turbine technology program.

Trackbacks

  1. […] from them to Basin. And one other turbine was purchased for the Mitchell Technical Institute (MTI) through a a $1.167 million grant from the U.S. Economic Development Administration. This turbine will be used to train students in their wind turbine technology […]

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: