July 15, 2009

Topping out the steel at Basin Electric’s first power plant

The steel was “topped out” on the Leland Olds Station Emissions Control Project July 14. During a construction project, a “topping out” ceremony happens when the final beam of steel is placed. A Christmas tree and American flag decorate the steel for good luck.
The last piece of steel on this project supports the ductwork for [...]